While estimating the cost of software, Lines of Code (LOC) and Function Points (FP) are used to measure which one of the following? (A) Length of code (B) Size of software (C) Functionality of software (D) None of the above
0 like 0 dislike

1 Answer

(B) Size of software
0 like 0 dislike

Related questions

The number of function points of a proposed system is calculated as 500. Suppose that the system is planned to be developed in Java and the LOC/FP ratio of Java is 50. Estimate the effort (E) required to ... ) 25 person months (B) 75 person months (C) 62.5 person months (D) 72.5 person months
Answer : (C) 62.5 person months ...

View solution
0 like 0 dislike
1 answer

A software project was estimated at 352 Function Points (FP). A four person team will be assigned to this project consisting of an architect, two programmers, and a tester. The salary of the architect is Rs.80,000 per month, the ... ) Rs.28,16,000 (2) Rs.20,90,000 (3) Rs.26,95,000 (4) Rs.27,50,000
Answer : (4) Rs.27,50,000 ...

View solution
0 like 0 dislike
1 answer
0 like 0 dislike
1 answer

Which one of the following statements, related to the requirements phase in Software Engineering, is incorrect ? (A) Requirement validation is one of the activities in the requirements phase. (B) ... . (D) Function points is one of the most commonly used size metric for requirements. 
Answer : (C) “Modelling-oriented approach” is one of the methods for specifying the functional specifications. ...

View solution
0 like 0 dislike
1 answer

Consider f(N) = g(N) + h(N) Where function g is a measure of the cost of getting from the start node to the current node N and h is an estimate of additional cost of getting from the current ... ? (A) A* algorithm (B) AO* algorithm (C) Greedy best first search algorithm (D) Iterative A* algorithm
Answer : (C) Greedy best first search algorithm...