Minm. deflection during transverse breaking load test is?
 (i) 5 mm
 (ii) 10 mm  
 (iii) 15 mm*
 (iv) 20 mm
0 like 0 dislike

1 Answer

(iii) 15 mm*
0 like 0 dislike

Related questions

Min. breaking load of 60kg weld during transverse breaking load test is? (i) 110 MT (ii) 115 MT* (iii) 90 MT (iv) 120 MT
Answer : (ii) 115 MT*...

View solution
0 like 0 dislike
1 answer

Min. breaking load of 52kg weld during transverse breaking load test is? (i) 90MT* (ii) 100 MT (iii) 110 MT (iv) 120 MT
Answer : (i) 90MT*...

View solution
0 like 0 dislike
1 answer

Tandem rig test with 450 probe for AT weld detects. (i) Horizontal longitudinal defect in weld. (ii) Vertical oriented defect in AT weld.* (iii) Transverse defect in AT weld. (iv) Defect in flange of AT welds.
Answer : (ii) Vertical oriented defect in AT weld.*...

View solution
0 like 0 dislike
1 answer

Distance between the two detonators should be (i) 15 Mt. (ii) 10 Mt.* (iii) 20 Mt (iv) None of the above
Answer : (ii) 10 Mt.*...

View solution
0 like 0 dislike
1 answer

Painting of weld is done up to (i) 10 CM minimum both side of weld & on welded surface .* (ii) 15 CM minimum both side of weld & on welded surface (iii) 20 CM minimum both side of weld & on welded surface (iv) None of the above
Answer : (i) 10 CM minimum both side of weld & on welded surface .*...

View solution
0 like 0 dislike
1 answer

50.5k questions

47.1k answers

240 comments