🔍
Which of the following is not included in waterfall model ? (A) Requirement analysis (B) Risk analysis (C) Design (D) Coding
0 like 0 dislike

1 Answer

(B) Risk analysis
0 like 0 dislike

Related questions

The major shortcoming of waterfall model is (A) the difficulty in accommodating changes after requirement analysis. (B) the difficult in accommodating changes after feasibility analysis. (C) the system testing. (D) the maintenance of system.
Answer : (A) the difficulty in accommodating changes after requirement analysis....

View solution
0 like 0 dislike
1 answer

The quick design of a software that is visible to end users leads to ............ (A) iterative model (B) prototype model (C) spiral model (D) waterfall model 
Answer : (B) prototype model...

View solution
0 like 0 dislike
1 answer

The most important feature of spiral model is (A) requirement analysis. (B) risk management. (C) quality management. (D) configuration management.
Answer : (B) risk management....

View solution
0 like 0 dislike
1 answer

Which one of the following is not a step of requirement engineering ? (A) Requirement elicitation (B) Requirement analysts (C) Requirement design (D) Requirement documentation
Answer : (C) Requirement design...

View solution
0 like 0 dislike
1 answer

Which process model is also called as classic life cycle model? (A) Waterfall model (B) RAD model (C) Prototyping model (D) Incremental model
Answer : (A) Waterfall model...

View solution
0 like 0 dislike
1 answer

50.5k questions

47.1k answers

240 comments

7.0k users