A software company needs to develop a project that is estimated as 1000 function points and is planning to use JAVA as the programming language whose approximate lines of code per function point is accepted as 50. Considering a=1.4 as multiplicative factor, b=1.0 as exponention factor for the basic COCOMO effort equation and c=3.0 as multiplicative factor, d=0.33 as exponention factor for the basic COCOMO duration equation, approximately how long does the project take to complete? (1) 11.2 months (2) 12.2 months (3) 13.2 months (4) 10.2 months
0 like 0 dislike

1 Answer

(2) 12.2 months
0 like 0 dislike

Related questions

The number of function points of a proposed system is calculated as 500. Suppose that the system is planned to be developed in Java and the LOC/FP ratio of Java is 50. Estimate the effort (E) required to ... ) 25 person months (B) 75 person months (C) 62.5 person months (D) 72.5 person months
Answer : (C) 62.5 person months ...

View solution
0 like 0 dislike
1 answer

A software project was estimated at 352 Function Points (FP). A four person team will be assigned to this project consisting of an architect, two programmers, and a tester. The salary of the architect is Rs.80,000 per month, the ... ) Rs.28,16,000 (2) Rs.20,90,000 (3) Rs.26,95,000 (4) Rs.27,50,000
Answer : (4) Rs.27,50,000 ...

View solution
0 like 0 dislike
1 answer
image

Let A and B be two fuzzy integers defined as: A={(1,0.3), (2,0.6), (3,1), (4,0.7), (5,0.2)} B={(10,0.5), (11,1), (12,0.5)} Using fuzzy arithmetic operation given by (A) {(11,0.8), (13,1), (15,1)} ( ... ,0.2)} (D) {(11,0.3), (12,0.5), (13,0.6), (14,1), (15,0.7), (16,0.5), (17,0.2)}
Answer : (D) {(11,0.3), (12,0.5), (13,0.6), (14,1), (15,0.7), (16,0.5), (17,0.2)}...

View solution
0 like 0 dislike
1 answer

Given the following statements: (a) To implement Abstract Data Type, a programming language require a syntactic unit to encapsulate type definition. (b) To implement ADT, a programming language requires some primitive operations that are ... (b) and (c) are false. (D) (a), (b) and (c) are true.
Answer : (D) (a), (b) and (c) are true....

View solution
0 like 0 dislike
1 answer

While estimating the cost of software, Lines of Code (LOC) and Function Points (FP) are used to measure which one of the following? (A) Length of code (B) Size of software (C) Functionality of software (D) None of the above
Answer : (B) Size of software...

View solution
0 like 0 dislike
1 answer

50.5k questions