šŸ”
Total no. of probes fitted on digital double rail tester for rail testing are
(i) 12
(ii) 8
(iii) 14*
(iv) 16.
0 like 0 dislike

1 Answer

(iii) 14*
0 like 0 dislike

Related questions

If digital DRT is calibrated for 300 mm longitudinal wave using 00 double crystal probe then 60kg rail ---------peak will appear at (i) 5.2 (ii) 5.7* (iii) 7.8 (iv) 8.6
Answer : ii) 5.7*...

View solution
0 like 0 dislike
1 answer

The increased gain of 10 dbs for single line & ā€˜Dā€™ marks rails on double/multiple lines shall be employed for classification of defects. (i) defect in weld (ii) defects in rail. * (iii) for both defects on weld & rail. (iv) None of above.
Answer : ii) defects in rail. *...

View solution
0 like 0 dislike
1 answer

For rolling mark 60 kg/Sail/X/2010 the first testing in the field after initial testing of rails in rail manufacturing plant, will be done. (i) After test free period of 25%. (ii) After passage of every 40 ... period.* (iii) After passage of 200 GMT. (iv) On the basis of annual GMT of the section.
Answer : (ii) After passage of every 40 GMT traffic during test free period.*...

View solution
0 like 0 dislike
1 answer

On Rajdhani routes testing frequency of rail testing for rail section of 60kg with annual GMT 80, will be. (i) 4 months (ii) 1 1ā„2 months (iii) 1 months* (iv) None of above.
Answer : (iii) 1 months*...

View solution
0 like 0 dislike
1 answer

Addition gain of 10 db is used for testing. (i) ā€˜Dā€™ marked rails on single lines. (ii) ā€˜Dā€™ marked rails on double lines. (iii) Testing on single line and ā€˜Dā€™ marked rails on double/multiple lines section.* (iv) None of above.
Answer : (iii) Testing on single line and ā€˜Dā€™ marked rails on double/multiple lines section.*...

View solution
0 like 0 dislike
1 answer

50.5k questions

47.1k answers

240 comments

7.0k users