Painting of weld is done up to
(i) 10 CM minimum both side of weld & on welded surface .*
(ii) 15 CM minimum both side of weld & on welded surface

(iii) 20 CM minimum both side of weld & on welded surface
(iv) None of the above
0 like 0 dislike

1 Answer

(i) 10 CM minimum both side of weld & on welded surface .*
0 like 0 dislike

Related questions

Marking on weld should be done (i) On centre of the rail head (ii) 10 mm below the top surface of rail head.* (iii) 10 mm above the bottom surface of rail head. (iv) None of the above
Answer : ii) 10 mm below the top surface of rail head.*...

View solution
0 like 0 dislike
1 answer

The increased gain of 10 dbs for single line & ā€˜Dā€™ marks rails on double/multiple lines shall be employed for classification of defects. (i) defect in weld (ii) defects in rail. * (iii) for both defects on weld & rail. (iv) None of above.
Answer : ii) defects in rail. *...

View solution
0 like 0 dislike
1 answer

When was the collar painting done ? (i) After the welding * (ii) after one week of welding (iii) After 15 days of welding (iv) None of the above
Answer : (i) After the welding *...

View solution
0 like 0 dislike
1 answer

Trimming of AT weld should be done by ? (i) Chisel (ii) Trimmer* (iii) Both (iv) None of the above
Answer : ii) Trimmer*...

View solution
0 like 0 dislike
1 answer

Marking on weld should be done which side? (i) Non gauge face side of A.T. weld * (ii) Gauge face side of A.T. weld (iii) On web of non gauge face side of A.T. weld (iv) On web of gauge face side of A.T. weld
Answer : (i) Non gauge face side of A.T. weld...

View solution
0 like 0 dislike
1 answer

50.5k questions