What are the recognized systems for pre heating of rails ends for AT Welding?  (i) Oxygen –LPG & Compressed air petrol both*
 (ii) Only Oxygen –LPG
 (iii) Only Compressed air petrol both
 (iv) both are correct
0 like 0 dislike

1 Answer

) Oxygen –LPG & Compressed air petrol both*
0 like 0 dislike

Related questions

What is Pre Heating Temperature of rail ends in AT Welding? (i) 300 ± 20oC (ii) 400 ± 20oC (iii) 500 ± 20oC (iv) 600 ± 20oC *
Answer : (iv) 600 ± 20oC *...

View solution
0 like 0 dislike
1 answer

Heating time with compressed air and petrol in SPW is ? (i) 4.0 to 4.5 minutes.* (ii) 4.0 to 5 minutes (iii) 5.0 to 5.5 minutes (iv) 5.5 to 6 minutes
Answer : (i) 4.0 to 4.5 minutes.*...

View solution
0 like 0 dislike
1 answer

ressure of LPG during pre-heating shall be? (i) 2.0 - 2.5 kg/ sq cm (ii) 2.0 - 2.5 kg/ sq cm (iii) 2.0 - 2.5 kg/ sq cm* (iv) 2.0 - 2.5 kg/ sq cm
Answer : (iii) 2.0 - 2.5 kg/ sq cm*...

View solution
0 like 0 dislike
1 answer

In AT welding process what is the role of asbestos powder & slag ? (i) To separate closing pin from portion* (ii) To hold the portion (iii) Both above are correct (iv) None of the above
Answer : (i) To separate closing pin from portion*...

View solution
0 like 0 dislike
1 answer

In AT welding process what is the role of closing pin ? (i) To hold the portion before melt (ii) To hold the asbestos powder & slag (iii) Both above are correct* (iv) None of the above
Answer : (iii) Both above are correct*...

View solution